How long does it take AT&T to install fiber?

Posted on: 09 Aug 2024
How long does it take AT&T to install fiber?

If you are wondering how long it would take to get AT&T fiber internet installed then it can range between a few days to a few weeks based on the following factors. Here's a breakdown of what impacts the fiber installation timeline and what to expect at each step of the process.

Scheduling and Permits

Every order for service can take 1-3 weeks from the time the order was placed to the time that installation is slated. This time is essential so that AT&T Internet can seek permits, assess your property, and schedule technicians. Each municipality has its own set of requirements for permits and the time it is willing to spend on these permits and this is the reason why the process may take a long time.

Property Survey

A surveyor will assess your home before installing it to determine where the pre-existing utility lines like fiber lines will go. They may need to get to certain parts of your home such as the side of the house or the backyard etc. This means that if there are such things as drainage systems or sprinklers that will hinder the way of the surveyor, the surveyor will find routing solutions for you. Surveying may be conducted on the same day as installation or within 1-3 days from the installation.

Fiber Line Installation

A routinary fiber internet installation appointment takes 4-6 hours. An AT&T technician will then pull the fiber optic cable from the roadside service box to your home. Installation may involve:

  • Installing fiber cables directly to the outside of your house via buried cable
  • Cutting holes in the wall and securing the termination box
  • Running wires to the inside and placing the fiber gateway/WiFi router.
  • The people I refer to as splicers joining the fiber cable from outside to the router

If the new fiber line cannot directly access your home, there is the possibility that the technician may be able to use the coaxial lines or wiring conduits. This eliminates deep drilling but involves items such as fiber/coaxial converters which are extra.

Possible inconveniences include disruption of any ongoing service that uses cables such as the internet, TV, or phone services during fiber installation when new lines are laid down. It may be easier if you are present during the exterior work although it is not necessary, the technician will need to access the inside to put up the router.

Post-Installation Site Visit

If further fiber splicing or piece configurations are required after the installation has been done, a visit to an AT&T site could be made within 1-3 days. This work would be done in the field where the fiber connection was going to be made. Another limitation of the construction of new underground infrastructure is that some municipalities also insist on getting a certificate of approval from the inspector.

Order Processing Time

How long does it take from the time the installation is complete and your AT&T fiber internet service is up and running: 1-2 business days? The wires or cables in your home are now capable of delivering Internet services but your account has to be configured and hence checked.

The order processing team will then flip the switch to activate your home connection to the ATT network. It takes up to 48 hours to complete all arrangements at the backend, although fiber internet often goes live way ahead of it.

Explaining Why Installing AT&T Fiber Takes Time

Several unique challenges come with running ultra-fast fiber optic internet to individual homes

Strategic Planning

Neighborhood Installation Plans are prepared by AT&T that cluster the home's installation in such a manner that technicians can be routed effectively. Your home may wait to align itself with more general area deployment schedules.

Permitting & Approvals

Fiber connections are a more complex service that demands construction on roads and gaining entry to homes, which implies municipal government approval. It is important to note that local governments have their working calendar to go through the permits and respond.

Property Access Solutions

Other challenges presented by yards and home layouts include; drainage systems, foundation depth, or inconvenient positions of the wall jack. Technicians learn how to design and implement plans that safeguard the current infrastructure as they connect fiber.

Fiber Splicing Precision

Each single strand of the fiber optic cable requires the perfect positioning and interconnection for signal lights to pass through without any hindrances. This work of splicing and cables is a delicate section that is carried out by technicians and cannot be done under pressure.


In Conclusion:
It can take as short a time as a week or even up to several weeks for the AT&T fiber to be fully installed. The finer details pertain to permitting, physical access to the property, construction permit from the concerned municipality, and the actual fiber connection. Although the coordination process may be a little irritating, it is the multi-step process that enables organizations such as AT&T to deliver ultra-fast Internet to homes.